Free for SE QLD homeowners. Forever.39 solar power in Alexandra Headland

Home/Solar Power/Alexandra Headland

39 Solar Power
in Alexandra Headland.

39 providers within 15km of Alexandra Headland · 15km radius.

Solar Power in Alexandra Headland, at a glance

39 solar power are listed within 15km of Alexandra Headland. Between them they hold 60 customer reviews at an average of 4.7 out of 5. Sunshine Coast Solar Farm is the most reviewed, with 3 reviews at 4.0 stars. Many also cover nearby Kawana Waters, Cotton Tree and Yaroomba.

Solar power installation in South East Queensland is one of the highest-growth home upgrade categories in 2025-26, driven by rising energy costs and the QLD Battery Booster Rebate. A typical SE QLD home installs a 6.6kW system for $4,500-8,000 (after STC rebates), with payback periods of 4-7 years and 25-year panel warranties standard. Adding a battery doubles the cost but unlocks self-consumption and feed-in tariff arbitrage.

The QLD-specific landscape: the state has the highest solar uptake per capita in Australia, but also some of the lowest feed-in tariffs (5-8c/kWh in 2026), which makes battery storage more attractive than in southern states. Reputable installers are CEC-accredited (Clean Energy Council); always check this before signing.

What to ask before hiring a solar installer

  • CEC accreditation. Mandatory for STC rebate eligibility. Check the installer''s accreditation number at cleanenergycouncil.org.au.
  • Panel and inverter brands. Tier 1 panel brands (LG, Trina, Q CELLS, REC, Jinko) and reputable inverters (Fronius, SMA, Sungrow, Enphase, Goodwe) come with longer warranties and stronger residual value. Avoid no-name imports.
  • Roof access and mounting. Tile roofs cost more to mount than metal. Two-story homes attract scaffolding fees ($300-800).
  • Battery sizing. A 10kWh battery suits most 4-person SE QLD households; a 13.5kWh Powerwall covers heavier night use.
  • Workmanship warranty. 10-year minimum on workmanship is standard. Anything shorter is a red flag.
  • STC rebate handling. The installer should handle the STC paperwork and discount it from your bill upfront. Watch out for quotes that don''t pre-deduct.

Common solar services and what they typically cost in SE QLD

  • 6.6kW system fully installed: $4,500-7,500 (post-STC)
  • 10kW system fully installed: $7,500-11,000 (post-STC)
  • 13.5kWh Powerwall battery: $13,000-15,000 (post-rebate)
  • 10kWh hybrid battery: $9,000-12,000 (post-rebate)
  • Solar hot water (heat pump): $3,500-5,000 (post-rebate)
  • Inverter-only replacement: $1,800-3,500
  • System health check / service: $200-400

Prices vary by suburb and provider. The listings below are sorted by best match; use the filters to find CEC-accredited solar installers who have been operating in SE QLD for 5+ years.

Common questions

Solar Power in Alexandra Headland.

How many solar power are in Alexandra Headland?+
There are 39 solar power listed within 15km of Alexandra Headland on HelpSorted, with 60 reviews between them.
Which solar power in Alexandra Headland have the most reviews?+
Sunshine Coast Solar Farm leads with 3 reviews at 4.0 stars. Compare all 39 by rating, reviews and reply time above.
What is the payback period on solar in SE QLD?+
For a typical 6.6kW system on a home using 25kWh/day, payback is 4-7 years depending on your energy retailer and how much you self-consume vs export.
Should I get a battery with my solar?+
At current SE QLD feed-in tariffs (5-8c/kWh) vs grid prices (30c+/kWh), batteries are cost-effective if you use 20%+ of your generation at night. Otherwise, panels-only is still profitable.
What size system do I need?+
Match it to your daily energy use plus growth (EV, pool, more occupants). Most SE QLD 3-4 person households fit comfortably on 6.6-10kW.
What is the QLD Battery Booster Rebate?+
The QLD government's $4,000 rebate for new battery installations, available to households earning under $180K. Stackable with the federal STC scheme.
How long do solar panels last?+
Tier 1 panels are warranted 25 years and typically produce 80%+ of original output at year 25. Inverters typically need replacement at year 8-12.
Can I add a battery later if I just get panels now?+
Yes, most modern hybrid inverters allow battery retrofit. Ask your installer to spec a hybrid inverter even if you're going panels-only initially, to avoid replacing it later.

Solar Power nearby

Other suburbs.

Browse solar power in suburbs near Alexandra Headland.

Other tradies in Alexandra Headland

Cross-category.

Related categories

Also consider.

Looking beyond Alexandra Headland?

See every solar power.
Across SE QLD.

Browse all solar power